RENEWABLE ENERGY & STORAGE
RENEWABLE ENERGY & STORAGE
Renewable Energy & Storage Applications
Self-Generated Green Power · Stable Supply · Cost Reduction
Integrates solar PV, energy storage systems (ESS), ice storage systems, and micro-hydro power. From planning and design to construction and smart energy management, we empower enterprises to enhance energy autonomy, fulfill major electricity user obligations, lower power bills, and achieve net-zero targets.
Major Power Users Regulation · 2026 Deadline
Are You a Major Electricity User?
The Clock is Ticking for Green Power Compliance
The Clock is Ticking for Green Power Compliance
Under the Renewable Energy Development Act, major electricity consumers with contract capacities of 5,000 kW or higher must fulfill green energy obligations equal to 10% of their contract capacity by installing renewable power generation, energy storage, or purchasing RECs/green power. Non-compliance results in monetary penalties.
2026 marks the final compliance deadline for current regulations, with thresholds set for review in 2026. Early planning is essential to avoid penalties and secure optimal deployment timing.
Capacity ≥ 5,000 kW
Designated as a major user subject to renewable energy obligations.
10% Green Obligation
Must build or secure green power equal to 10% of contract capacity.
4 Compliance Pathways
Generation, storage, green power purchases, or RECs (flexible mix).
Penalties for Default
2026 is the current final deadline. Early deployment is far more cost-effective.
* Information serves as a regulatory overview. Actual capacity requirements, pathways, and timelines depend on official Ministry of Economic Affairs announcements and individual site evaluations.
System Design Highlights & Services
Solar Power Planning
Evaluates optimal installation capacity and generation benefits based on rooftop/site conditions to increase self-generated green power ratios.
Energy Storage Integration
Integrates storage systems with renewable generation and facility demand for peak shaving, load shifting, and backup power.
Ice Storage Design
Uses off-peak electricity to freeze ice, providing HVAC cooling during peak hours to reduce contract capacity and electricity costs.
Micro-Hydro Applications
Harnesses on-site water resources (such as recycled water or discharge streams) for power generation, creating steady green energy returns.
Smart Energy Management
Utilizes the ESMC energy management platform for power dispatching, load forecasting, and performance tracking.
Carbon & ROI Assessment
Quantifies carbon reduction and financial ROI to help enterprises meet ESG requirements and net-zero carbon goals.
Proven Implementation Benefits (Case Reference Data)
Green Power Ratio
10~30% ↑
Achievable ratio by site conditions
Electricity Bill Savings
15~30% ↓
Peak shaving & off-peak benefits
Payback Period
3~6 Yrs
Varies by scale & tariff structure
Carbon Reduction
20~40% ↑
Overall emissions reduced
* Benefits depend on site conditions, solar/water resources, tariff structures, and operational modes. Actual figures subject to site assessment and M&V verification.